New Media Church
This project started as a warehouse, with other warehouses either side and a distance along a tunnel. Inside the tunnel forklift trucks and vans come in and out. The building work had started and a mez floor was added and the insulation and the acoustic treatment installed. L.C.C. started once an empty shell was available. The grid went in, and then the entire room was painted black. The set came in as did the LED Video walls. Once the floor had been added L.C.C. returned to hang all the luminaires, install the DMX/WIFI for luminaires and set. Desk programming and the colours for the set for the different programme strands saved to the desk.